Steel Building USA / Secure Dumpster™ / Municipal Reference

Standard design. Local review.

A procurement and plan-check reference for building, public works, stormwater, facilities, and agency teams. Not a city standard, blanket pre-approval, or permit.

Watermarked Secure Dumpster architectural cover illustrating standard enclosure concepts
Illustration from the existing plan-cover preview, not a photograph of an installed enclosure.

Four site configurations

SD-S | Single New

One-container new-build steel enclosure.

SD-D | Double New

Two-container new-build steel enclosure.

SD-R | Single Retrofit

Roof and gates for a qualifying existing CMU enclosure.

SD-RD | Double Retrofit

Roof and gates for a qualifying two-container CMU enclosure.

Where reviewers find the information

CSOverview, model index and stated design basis
A1–A4New-build and retrofit architectural elevations
D1Gates, trim and applicable center-post details
S0 / S1.0Structural specifications, design criteria, schedules and framing options
S2.0 / S2.1Original signed framing, anchorage and footing details
CalcsOriginal signed calculations for the specified engineering scope

Applicant submittal checklist

  • Site identity: registered property, owner authorization, applicant and intended enclosure model
  • Layout and access: scaled footprint, accessible routes, property setbacks, truck approach and gate clearance
  • Existing conditions: for retrofits, CMU construction/grout, wall/footing condition, slab versus asphalt, photographs and dimensions
  • Structural criteria: local wind, seismic, soils, snow, anchorage and model design applicability
  • Stormwater/drainage: roof discharge, grading, local stormwater controls, and any required BMPs
  • Construction controls: utilities, inspections, permits, special inspections and hauler coordination
  • SD-RD gate-post condition: local acceptance of center-post hinges, anchors and underside-of-header connection

The original signed structural set uses a 2025 CBC basis with specific design limits. Existing site conditions may require supplemental review; an applicant must not assume automatic qualification.

Procurement pathways

$495 — one registered enclosure/site plan license. $1,495 — five registered enclosure/site licenses. Municipal pilot agreements or additional services are separately quoted and subject to agency procurement procedures.

Use the standard package to begin a site-fit and submittal conversation—not to bypass plan check. The authority having jurisdiction retains final approval.

City / Plan Check Resource HubRequest Municipal Site Review

Vendor reference packet; it is not an AHJ determination or technical approval of a specific retrofit connection. Steel Building USA, Inc. / Secure Dumpster™ • 951-760-9968.