Transforming Land into Legacies
Expert Real Estate Development for Residential, Commercial, and Mixed-Use Properties
We do more than build properties—we craft vibrant, thriving communities. With a commitment to quality, innovation, and sustainable hazard resistant structure design, we develop spaces that are not just beautiful but built to last.
Whether it’s a dream home, a dynamic commercial hub, or a smart investment, we bring vision to reality with precision and passion. Because where you live and work should inspire you every day.
Real Estate Development Services
- Four keys to a successful Project- Financial Feasibility, Experienced team, Strategic plan, Stakeholder support

Our Process
The six phases of the real estate development process build on each other, starting with a development concept and ending with a finished structure. While these phases are presented in an orderly flow, activities often begin in one phase and end in another.

Phase 1
CONCEPT PLANNING, FEASIBILITY, AND DUE DILIGENCE
- Define the needs and goals of the facility.
- Define the scope, budget, and schedule.
- Select key development team members.
- Identify potential funding sources.
Read More
This phase identifies the facility’s big-picture needs, such as the goals that will be achieved by building the structure, where it will be built, and the people and businesses that will benefit from it when it is finished. During this phase, the team that will be responsible for the entire development process.
Actions and outcomes
- Feasibility study finished
- Programming plan and initial architectural renderings done
- Market analysis and business plan complete
- Funding strategy created
Conducting a feasibility study
The feasibility study is an assessment of numerous factors, including economic, technical, demographic, legal, competition, and organizational capacity, to assess the strengths and weaknesses of a proposed project based on its cost and value.
Working with the architect during concept planning
After the feasibility study is complete, the first step in creating architectural drawings for the project is called site programming. Some owners complete this work on their own, but it is more typical to work with the architect. This work is an “add-on” service to the standard contractual agreement with the architect. At this point, your goal is to determine the scope of work to be designed.
For acquisitions: Site selection begins
Conduct due diligence.
If you are purchasing a property, you will need to make sure the selected property can meet the project goals. Due diligence is the research conducted before engaging in an acquisition transaction to determine the associated risks. It is a process with several defined steps and outputs.
Phase 2
PRE-DEVELOPMENT DESIGN
- Finalize the development team and define the roles of each member.
- Finalize feasibility study, due diligence, and environmental reviews.
- Develop the preliminary budget and negotiate preliminary financing commitments.
- Complete the site plan and schematic design.
- Evaluate design alternatives and options.
Read More
In this phase, we will finalize your initial architectural fit study and initial site plan and address every issue and contingency that pops up before we start development of the detailed construction drawings. At this stage, all the core development team members (real estate attorney, architect, and construction manager) are contracted, the architectural drawings become schematic drawings, and all reviews and studies are finalized. This phase is usually the longest of the entire real estate development process.
Actions and outcomes
- Contracts with team members complete
- Environmental Review (Phases I & II) complete
- Proof of site control either by letter of intent, option, or purchase agreement
- Preliminary building plans and other schematic drawings complete
What is schematic design?
Schematic design, sometimes called concept design, is the first step of architectural design. In this phase, architects use rough sketches to produce more detailed drawings. These drawings show floor-by-floor and room-byroom dimensions, including common areas, hallways, entrances, and exits, and should include internal and external views. Additionally, the architect will begin to develop more detailed specifications about major components of the project. These include:
- Type, quantity, and quality of materials
- Systems such as electrical, plumbing, and heating, ventilation, and air condition (HVAC)
- Stairways, roofs, foundation, walls, and doors
- Landscaping, open space, parking, and traffic flow
Phase 3
DEVELOPMENT PLANNING
- Finalize financing commitments.
- Finalize the design drawings (DDs) and construction drawings (CDs).
- When CDs are 50% complete, issue an RFP for general contractors.
- When CDs are 85% complete, submit them to the local planning department and receive a building permit.
- Hire a general contractor with a GMAX contract.
Read More
The development planning phase begins with the architect and engineers creating the design drawings. It ends with completion of the construction drawings. In this phase, building plans are submitted to planning departments, a building permit is issued, a closing date or lease (site control) on the land where the building will sit is set, and an RFP is released to solicit general contractors. This phase takes approximately 6 months and involves hundreds of hours of detailed work by architects and engineers.
Actions and outcomes
- Final update of project schedule, scope, and budget with project entities and stakeholders before construction begins, and contracts reviewed
- Furniture, fixtures and equipment (FFE) package and interior design planning finalized
- Approvals from local agencies (fire, water, utilities) obtained
Phase 4
ACQUISITION COMPLETION
- Advance an LOI with terms and dates to complete the sale
- Complete due diligence
- Achieve clear title and transfer ownership
Read More
Acquisition begins as a process involving feasibility and due diligence studies of the physical property, performed by the buyer’s team. This team includes a brokerage company and real estate legal team. If the studies are positive, the legal team will send a letter of intent (LOI) outlining their terms of purchase. If the seller agrees, an escrow account is opened and earnest money is deposited. A more thorough due diligence and Physical Needs Assessment (PNA) is performed after the LOI. Once the Will Serve letter and other acquisition milestones are achieved, the closing transfers title and ownership to you.
Actions and outcomes
- Reports on the site, title, and any legal issues involving the property obtained
- American Land Title Association (ALTA) survey completed
- Will Serve letters from utility companies received
Phase 5
CONSTRUCTION
- Perform demolition and grading to prepare for construction.
- Hire and manage subcontractors.
- Oversee all construction activity
- Schedule and complete building inspections.
Read More
In the construction phase, the general contractor will sign on subcontractors at prevailing wage and manage reporting requirements. Upon issuance of the building permit, the owner (or owner’s agent) issues a Notice to Proceed, and the general contractor begins construction as defined in the contract. The construction contract negotiated during the acquisition phase will define the cost and duration of construction. Throughout the construction phase, the construction manager will serve as the owner’s representative per the terms of their contract and should prioritize keeping the site secure and safe to avoid accidents. Construction can easily make up 50–75% of a development budget, depending on a variety of factors.
Actions and outcomes
- Facility is readied for walkthrough and closeout
- All bills paid; no liens, no lawsuits, no accidents, no theft, no problems
Phase 6
CLOSE OUT AND MOVE IN
- Attend a walkthrough and inspection with the general contractor.
- Attend inspections by third parties to obtain a Certificate of Occupancy.
- Ensure ownership documents and any maintenance manuals are transferred to you.
Read More
Close out is the final opportunity for inspections, revisions, and corrections. It is the phase that confirms all details and quality standards are met. It occurs when the structure is 99% completed and the general contractor notifies you, the owner, that the building is ready for occupancy. Your construction project is complete when you receive a Certificate of Occupancy.
Actions and outcomes
- Receive a Certificate of Completion and become the owner
- Receive all paperwork, guarantees, manuals, and instructions for maintaining your property
Why Choose Steel Building USA?
Unmatched Selection
We offer a comprehensive range of steel building products, including wall and roof panels, trusses, floor systems, and more, to suit the specific needs of your project.
Superior Quality
We are committed to manufacturing the highest quality steel building components using top-of-the-line materials and rigorous quality control processes.
Competitive Prices
Our direct-factory model and efficient manufacturing practices allow us to offer competitive prices without compromising on quality.
Fast Delivery
We understand the importance of keeping your project on schedule. Steel Building USA offers fast delivery to get the materials you need on-site when you need them.
Exceptional Customer Service
Our team of experienced professionals is dedicated to providing exceptional customer service throughout your entire building journey. We are here to answer your questions, address your concerns, and ensure your complete satisfaction.

Years of Experience
Completed Projects
Frequently Asked Questions
What are the advantages of using Steel Building USA steel buildings?
Steel Building USA steel buildings offer numerous advantages:
- Durability and Strength: Steel structures are renowned for their exceptional strength, resilience, and resistance to fire, wind, and earthquakes.
- Faster Construction: Pre-fabricated steel components significantly reduce on-site construction time compared to traditional methods.
- Cost-Effective: Steel offers inherent cost advantages over conventional building materials, and our efficient processes further reduce project expense.
- Sustainable Choice: Steel is a highly recyclable material, and our lean manufacturing practices minimize waste.
- Versatility: Steel buildings are suitable for a wide range of applications, from residential homes and garages to commercial buildings and industrial facilities.
What steel building products does Steel Building USA offer?
We offer a comprehensive selection of steel building products, including:
- Wall and Roof Panels: Available in various thicknesses, finishes, and insulation options to suit your specific needs.
- Floor Trusses: Engineered for strength and designed to integrate seamlessly with other building components.
- Light Gauge Steel Studs: Perfect for interior and non-load-bearing walls, offering superior strength-to-weight ratio and ease of installation.
- Building Kits: Complete pre-fabricated kits for houses, garages, and other structures, including all necessary wall panels, trusses, and hardware.
Do I need a permit to build a steel building?
Permitting requirements vary depending on your location. We recommend checking with your local building department to determine specific permit needs for your project.
Can Steel Building USA help with the design of my steel building?
Our team can assist you with designs and technical aspects to ensure your chosen steel building components meet all structural requirements. We can also connect you with qualified architects or engineers in your area who can handle the design phase of your project.
How long does it take to get steel building materials from Steel Building USA?
Lead times can vary depending on the complexity of your project and current production volume. However, we are committed to efficient manufacturing and typically deliver steel building materials within 2-6 weeks from order confirmation. Contact us today for a more specific lead time estimate for your project.
What Our Clients Are Saying
“We needed a fast and reliable solution for temporary housing after a hurricane hit our community. Steel Building USA came through in a big way. Their prefabricated shelters were easy to assemble and provided much-needed safe haven for our residents. We truly appreciate their prompt response and quality products.”
“Building our new warehouse on time and within budget was crucial. Steel Building USA’s wall panels and trusses were essential in achieving that goal. The ease of installation saved us significant labor costs, and the high quality of the materials gives us peace of mind knowing our building is strong and durable.“
“We were impressed with Steel Building USA’s commitment to understanding our specific needs. They worked closely with us to design custom floor trusses that perfectly integrated with our mechanical and electrical systems. The entire process, from design to delivery, was smooth and efficient.“